skip to main content
Site banner

 

 

The group lobbying for an expressway interchange at Peka Peka has submitted an application for the project to be “shovel ready” when the Covid-19 crisis ends.

Since the lockdown, Crown Infrastructure Partners Ltd (CIP) has been helping the Infrastructure Industry Reference Group (IIRG) to advise the Government on issues affecting the construction industry.  The reference group has been asked to prepare a list of infrastructure projects that are ready for construction and could be deployed as part of a post-Covid stimulatory package.

CIP invited applications for projects to be considered. The lobby group Finish our Road – Connect Kāpiti (FOR) put in an application to have the interchange considered as a “shovel ready” project. With a deadline at 5pm on Tuesday (April 14), the group was busy during Easter with Zoom meetings most days, working on the application.

FOR’s application says the project is to complete an interchange for connectivity at Peka Peka by providing two south‐facing slip roads in conjunction with the Peka Peka to Ōtaki expressway project. It would be able to start reasonably quickly and could be considered as an “add‐on” to the current PP2Ō construction.

FOR says the interchange is key to continued local employment, especially while resources and machinery are in the vicinity.

The northern direction slip road could be started almost immediately while the final design is completed for the southern direction slip road. This valuable infrastructure would make better use of the investment by maintaining the local connectivity to the expressway, including for emergency services.

“If this doesn’t occur, it has been modelled that on day one of PP2Ō opening, 2200 vehicles per day will be forced to use Waikanae residential roads, creating serious safety issues and increased emissions,” FOR said in the application.

“It will also provide continued employment for many Kāpiti workers and bring much needed continued business and tourism to our community.”

Interchange lobby group makes ‘shovel ready’ application

 
 
 

Home page stories from May 2020

The Ōtaki Foodbank is coping, with community support, while seeing a big leap in demand for food parcels. READ MORE

A review concludes that Ōtaki’s former Children’s Health Camp is to be recognised for its significance. READ MORE

Figures released recently by Stats New Zealand show Ōtaki with 906 more than the previous Census in 2013. READ MORE

Taipari Tukerangi turned 11 last month so his Mum wanted to do something special, despite the lockdown. READ MORE

 

Home page stories from April 2020 (second edition)

An Emergency Operations Centre is running during the pandemic to keep core essential services in place. READ MORE

Kāpiti Coast District Council is promoting immediate measures to support local people and businesses. READ MORE

Shovel ready submission by interchange lobby to boost expressway interchange chances. READ MORE

Ōtaki RSA president calls ‘stand at dawn’ for Anzac Day a great initiative and is encouraging locals. READ MORE

 

+ Text Size -
Original generation time 1.6563 seconds. Cache Loaded in: 0.0352 seconds.